It is exactly 40 years since the Demerara Harbour bridge was commissioned and the man behind the construction of the 6074 feet structure, Joseph Holder, takes us through the period of the idea of the Demerara Harbour bridge to the victorious day when the bridge was officially opened to traffic. He spoke with Royden James.